“You don’t want the utility or maybe the grid operator to get overpaying for power once they don’t really have to,” Davis explained. To qualify for these adders, tasks usually need to have to satisfy particular conditions, like prevailing wage and apprenticeship demands, and will begin construction inside of specified https://californiasolarcontractors.business.blog/2023/08/17/4-qualities-of-the-best-solar-installers/