The 25mm thick large metal tube is driven Together with the conclusion closed by a steel shoe. On reaching the required driving resistance, a full duration cage is lowered in to your tube and filled with large slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://ericktfoua.blogadvize.com/39828814/the-ultimate-guide-to-cast-in-situ-piles-in-bangladesh