PIK2 began building in 2016 according to TOWNLAND’s renewed Master System on this Beforehand swampy and small yielding agricultural land. This was followed by development of the primary ring highway network as the primary backbone in the Township’s circulation system and subsequently the canal program. To this point (mid-2021), PIK https://www.propanraya.com/propan-sandimas-experience-center-hadir-di-pik-2-tawarkan-inovasi-terbaik-untuk-solusi-cat-dan-pelapis